News

NMMC TO REPLACE SEWERAGE PIPLENES AT SECTOR 8, KOPERKHAIRANE

pipelne-2The issue of the dirty and problematic sewerage pipelines situated at Koperkhairane is very soon going to be resolved as NMMC has approved the proposal of repair work of these pipelines at a cost of Rs 26 lakhs. It is relief for the residents of sec 8 Koperkhairane as the deteriorating sewerage pipelines as NMMC has decided to replace these pipelines with new ones. These pipelines has deteriorated so much that dirt an debris used to leak out on the roads and situation was worse during monsoon times. NMTV News visited the node and spoke to the residents to stated that the pipelines should be immediately changed. There are around 4500 houses in this node with a population of around 3 lakhs. The pipelines were installed by CIDCO in the year 1990 but did not see any maintenance since the time it came under the jurisdiction of NMMC. Swastik Infrologics have been given the contract for replacing and the works for these pipelines. NMMC has approved the proposal at a cost of Rs 2575949. The contractor needs to complete the work in 3 months. With cameraperson Roshan Hate, Sudhir Sharma for NMTV News.

Tags

Related Articles

Back to top button
Close
Close